?巖棉板生產(chǎn)廠家外墻保溫施工技術(shù)

巖棉板制造商的外墻保溫施工過程主要包括:基礎(chǔ)處理,膠粘劑配置,固定裝置,底部抹灰砂漿,耐堿網(wǎng)眼布,表面抹灰砂漿,保溫系統(tǒng)驗收和裝飾層施工。我們的齊工巖棉板廠家今天要談?wù)摰氖钦迟N巖棉板的過程。

?巖棉板生產(chǎn)廠家外墻保溫施工技術(shù)
 
The external wall insulation construction process of rock wool board manufacturer mainly includes: foundation treatment, adhesive configuration, fixing device, bottom plastering mortar, alkali resistant mesh cloth, surface plastering mortar, insulation system acceptance and decorative layer construction. Our Qinghai rock wool board manufacturers today to talk about the process of sticking rock wool board.
 
齊工巖棉板
 
1.粘貼時,從底部到頂部用粘結(jié)砂漿鋪砌巖棉板。巖棉板的長邊在水平方向上放置和粘貼。垂直接縫應(yīng)逐行錯開1/2線,且板長等于或大于200mm。
 
1. When sticking, place rock wool board from bottom to top with binding mortar. The long sides of the rock wool board are placed and pasted in a horizontal direction. The vertical joints shall be staggered 1/2 line by line and the length of the plate shall be equal to or greater than 200mm.
 
2.墻角兩側(cè)的巖棉板應(yīng)錯開重疊,并應(yīng)確保墻角的垂直性。
 
2. The rock wool boards on both sides of the corner shall be staggered and overlapped, and the perpendicularity of the corner shall be ensured.
 
3.開口(如門窗)的四個角應(yīng)切成整塊巖棉板,不要拼接。巖棉板的接縫與開孔四個角之間的距離應(yīng)大于200mm,開口四側(cè)其他巖棉板的寬度應(yīng)不小于200mm。
 
3. The four corners of openings (such as doors and Windows) should be cut into a whole rock wool board, do not join. The distance between the joint of the rock wool board and the four corners of the opening shall be greater than 200mm, and the width of the other rock wool board on the four sides of the opening shall be no less than 200mm.
 
4.均勻地按壓巖棉板,使其完全粘附在基礎(chǔ)層上。粘結(jié)砂漿的壓實厚度盡量控制在3mm之內(nèi)。
 
4. Press the rock wool board evenly to make it adhere to the base layer completely. The compaction thickness of bonding mortar should be controlled within 3mm as far as possible.
 
5.隨時使用2m斜尺和電線支架檢查平面度和垂直度,如果不符合要求,請立即進行校正。
 
5. Use 2m inclined scale and wire bracket to check the flatness and perpendicularity at any time. If it does not meet the requirements, please correct it immediately.
 
6.立即刮下板縫和板側(cè)面之間的殘留砂漿。
 
6. Immediately scrape off the residual mortar between the seams and the sides of the board.
 
7.巖棉板之間的間隙應(yīng)控制在1.5mm之內(nèi),接頭之間的高度差應(yīng)控制在1mm之內(nèi)。如果接頭的寬度超過1.5毫米,則可用適當寬度的巖棉板條填滿縫隙,注意不要讓板條粘住。
 
7. The gap between rock wool boards should be controlled within 1.5mm, and the height difference between joints should be controlled within 1mm. If the width of the joint exceeds 1.5 mm, rock wool slats of appropriate width may be used to fill the gap, taking care not to allow the slats to stick.
 
另外,請關(guān)注生產(chǎn)巖棉板的廠家官方網(wǎng)站,以了解更多有關(guān)齊工巖棉條產(chǎn)品的信息。您可以直接聯(lián)系在線客服或留言,我們將竭誠為您提供更好的服務(wù)!
 
免責聲明:本網(wǎng)站上的某些文章和圖片來自Internet,僅供參考。版權(quán)屬于原始作者。如果您的權(quán)利受到侵犯,請與我們聯(lián)系,我們將盡快處理。

上一篇:有關(guān)巖棉板生產(chǎn)企業(yè)的四大應(yīng)用領(lǐng)域詳解

下一篇:使用巖棉板時應(yīng)注意的事項

主站蜘蛛池模板: 99久久精品久久久久久清纯| 亚洲成a人片在线观看高清| 狠狠色噜噜狠狠狠狠97首创麻豆| 999国产精品| 日日摸日日碰夜夜爽亚洲精品蜜乳| 蜜臀av在线播放一区二区三区| 色免费视频| 香蕉在线播放| 又爽又色禁片1000视频免费看| 伊人激情视频| 99精品久久精品一区二区| 丰满熟女高潮毛茸茸欧洲| 亚洲色图88| 国内精品伊人久久久久777 | 国产偷国产偷亚洲清高动态图 | 亚洲r成人av久久人人爽| 内射老阿姨1区2区3区4区| 99热只有| 国产av无码国产av毛片| 麻豆精品国产入口| 婷婷五月综合激情| 国产片av国语在线观看| 黄色av网| 99久久久无码国产精品免费| 99福利资源久久福利资源| 国产精品丝袜黑色高跟鞋| 偷偷做久久久久网站| 久久午夜夜伦鲁鲁片无码免费| 国产成人欧美日本在线观看| 午夜福利啪啪片| 成年无码av片在线| 4438x成人网最大色成网站| 亚洲女人久久久| 亚洲色偷拍区另类无码专区| 国产动作大片中文字幕| 欧美色精品在线| 天天摸天天做天天爽水多| 亚洲成人精品视频|